Please see our BMPs below, or download a PDF file below.

BEST MANAGEMENT PRACTICES (BMPs)

EVERYONE MUST COMPLY

NON-COMPLIANCE WITH BMPs WILL RESULT IN A MINIMUM $500 FINE
INCLUDING OWNER PERFORMING BOTTOM PAINT WORK (see #1)

DO NOT SHIFT STANDS, PADS OR BLOCKING

1.
ALL BOTTOM PAINT RELATED WORK MUST BE PERFORMED BY SEAVIEW BOATYARD PERSONEL.
2.
NO SCRUBBING OF BOTTOM PAINT UNDER ANY CIRCUMSTANCES
3.

Grinding and power sanding operations must be contained by tenting (no fugitive dust) and performed with approved vacuum sander. Please see yard store for necessary tenting material and clean-up equipment. DO NOT HOSE DOWN STALL.

4.
No wet sanding
5.
Boat stalls must be swept or vacuumed daily.
6.
No spray painting or sandblasting
7.
No gray water discharge
8.
No bilge or ballast water pumping, contact yard store for information or call:
Emerald Recycling (206) 832-3000
or
ORRCO (800) 367-8894
9.
Painting procedures for "do-it-yourselfers":
All paint cans, brushes, rollers, roller trays, etc. must be in a containment tray. Cans must be sealed at all times, not left open during job.
10.
When stripper is used visqueen must be spread to capture residue.

11.

Any oil, anti-freeze, solvents or contaminated fuel must be disposed of through the yard store. Contact yard store for additional information.
12.
IF A SPILL OCCURS PLEASE CONTACT YARD STORE IMMEDIATELY FOR
ASSISTANCE AND SPILL CONTAINMENT KIT.

These Best Management Practices are adhered to at all Seaview Boatyard Inc. locations. A more extensive copy may be obtained in the office.

BMPs (Download PDF file here)
If you do not have Acrobat Reader installed on your computer, click the button to the right, to download and install it for free.
Back to top

© 2003-2011 Seaview Boatyard, Inc.

Web site designed by
Dolphin Design
HOME | SERVICES | LOCATIONS | RATES | ABOUT US | LINKS
BMPS
RATES
Yard Policies
BMP's